Great post from Parker Gallant
Parker Gallant Energy Perspectives
Napanee gas plant: more flexible resources needed to offset intermittent wind — trouble is, they also push emissions up
January 23, 2017
The Canadian Wind Energy Association (CanWEA) summarized their submission on Ontario’s long-term energy plan (LTEP) to the IESO on their website. “Ontario is the Canadian leader in clean wind energy with 4,781 megawatts of installed capacity, supplying about 5 per cent of the electricity that Ontarians depend on,” CanWEA said. “Wind has been the largest source of new electricity generation across Canada over the past decade. Over this time, costs have come down as capacity factors have increased.”
Here’s the other side of that apparent success story. It’s not as rosy as CanWEA, the wind power industry lobbyist, would like you to believe.
The IESO just released the 2016 Electricity Data indicating industrial wind turbines (IWT) were responsible for the generation of 9.0 terawatts (TWh) of power, representing…
View original post 627 more words